Appui au renforcement du secteur de l’énergie / Support to strengthening in energy sector

Morocco

Country

24 MONTHS

Duration

1.150.000 €

Budget

FR, DE

Member States

Morocco and the European Union (EU) have established a strong and dynamic partnership which has been steadily deepening since the year 2000 when the EU-Morocco Association Agreement entered into force. In order to further strengthen the partnership a number of sectors and priority activities – including the energy sector – were jointly identified and supported by the multi-sector program called “Achieving the Advanced Status” (Réussir le Statut Avancé). This Twinning project is supporting the implementation of key reforms in the energy sector in order to get closer to EU regulatory standards. The responsibility for reforms in the energy sector lies within the Ministry of Energy, Mines, Water and Environment (MEMWE) of Morocco.

The member state consortium consisting of the Ministry for the Ecological and Inclusive Transition of France and the Federal Ministry for Economic Affairs and Energy of Germany support the MEMWE to reach the targets set by the national strategy such as the security of reserves, the availability of energy, an open access to energy and the management of demand and environment protection.

Weitere Projekte

Building the Palestinian Agricultural Insurance Systems and Services

Noch 65 Tage

Land:
Palestinian territories
Projekt ID:
PS 19 ENI AG 01 20
Dauer:
36 Monate
Budget:
2.100.000 €
Federführende Institution:
BMEL
Download fiche
pdf (1,0 MB)

Support for the process of convergence towards the EU acquis in the institutional strengthening of the water police and in the management of water resources at the level of a hydraulic basin agency

Noch 34 Tage

Land:
Morocco
Projekt ID:
MA 18 ENI EN 01 20
Dauer:
24 Monate
Budget:
1.000.000 €
Federführende Institution:
BMU
Download fiche
pdf (972,0 KB)

Appui institutionnel à la modernisation de la télévision tunisienne de service public dans le cadre de la transition démocratique

Noch 18 Tage

Land:
Tunisia
Projekt ID:
TN 18 ENI TE 01 20
Dauer:
24 Monate
Budget:
1.000.000 €
Federführende Institution:
BKM/KMK
Download fiche
pdf (711,8 KB)